Expertise

Sterile Production

Deep expertise in aseptic manufacturing processes — from formulation through filling, sealing, and final product inspection — ensuring product sterility, patient safety, and regulatory compliance at every stage.

Aseptic Filling Technologies

Comprehensive knowledge of filling technologies for all primary container types, with hands-on experience across dozens of production lines worldwide.

  • Vials — liquid and lyophilized fills, multiple volume ranges
  • Pre-Filled Syringes — glass and polymer barrels, staked needle and Luer lock
  • Ampoules — open and closed filling systems
  • Cartridges — for pen-delivery systems
  • Ready-to-Fill (RTF) — pre-sterilized containers and nest/tub configurations

Sterilization & Processing

Mastery of bulk product sterilization methods and processing equipment critical for maintaining sterility assurance levels throughout the manufacturing chain.

  • Steam Sterilization — saturated steam autoclaving
  • SIP — Steam-in-Place for process vessels and piping
  • Sterile Filtration — 0.2 µm and nanofiltration processes
  • Depyrogenation — hot-air dry heat processes

Homogenization

Particle size reduction technologies including aseptic configurations:

  • HPH (High Pressure Homogenizer) — GEA Niro Soavi
  • Microfluidizer — Microfluidics
  • Agitated Beads Mill — Netzsch
  • Rotor Stator — Ytron

Visual Inspection

Automatic visual inspection for particulate and cosmetic defect detection:

  • Eisai
  • Körber \ Seidenader
  • Brevetti

Process Development

End-to-end support for bringing products from development to full-scale production:

  • Tech transfer from R&D to production
  • Scale-up methodology and execution
  • Process robustness assessment
  • Control system design (21 CFR Part 11)

Critical Insight

Not all equipment is adapted to sterile production. In many cases, well-known manufacturers have made design mistakes or failed to consider all requirements for aseptic equipment. There is a need to examine the design in-depth, and if necessary, to propose changes and adjustments before procurement. This is where independent SME expertise prevents costly downstream failures.